archive-de.com » DE » M » MS2-ENGINEERING.DE

Total: 55

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • ms2-engineering.com
    Engineering Test benches Case studies Test benches for components Leakage test benches Test benches for fuel cells Mobile filling station Service Imprint Ihr Browser unterstützt Inlineframes nicht oder zeigt sie

    Original URL path: http://ms2-engineering.de/e_produkte.htm (2016-02-12)
    Open archived version from archive


  • ms2-engineering.com
    Our portfolio Contact Engineering Test benches Service Support in test operation Update of existing test benches Maintenance service Calibration Imprint Ihr Browser unterstützt Inlineframes nicht oder zeigt sie in der

    Original URL path: http://ms2-engineering.de/e_service.htm (2016-02-12)
    Open archived version from archive

  • ms2-engineering.com
    services in test technology Details MS2 test benches MS2 offers specialized solutions for customized requirements from simple test equipment up to fully automated benches Details MS2 Service MS2 offers an

    Original URL path: http://ms2-engineering.de/e_unsere_leistungen_start.htm (2016-02-12)
    Open archived version from archive


  • 48551 0 49 0 7021 48551 11 http www ms2 engineering de Driving on highway A8 direction Munich Stuttgart Highway A8 München Stuttgart Exit Kirchheim Teck Ost Follow the sign to Kirchheim Take the 2nd exit in direction Weilheim Jesingen Stadion At the next cross section turn left to Weilheim Jesingen After about 300 meters turn right into Einsteinstrasse leading to the industrial area Bohnau Follow Einsteinstraße for about 500

    Original URL path: http://ms2-engineering.de/e_unternehmen_kontakt.htm (2016-02-12)
    Open archived version from archive


  • Munich Stuttgart Highway A8 München Stuttgart Exit Kirchheim Teck Ost Follow the sign to Kirchheim Take the 2nd exit in direction Weilheim Jesingen Stadion At the next cross section turn left to Weilheim Jesingen After about 300 meters turn right into Einsteinstrasse leading to the industrial area Bohnau Follow Einsteinstraße for about 500 meters then turn right into Gaußstraße Follow till next crossing MS2 is the first building on the

    Original URL path: http://ms2-engineering.de/e_kontakt_gross.htm (2016-02-12)
    Open archived version from archive


  • developed the compact hydrogen gas filling station Tankfix MS 300 The refueling of vehicles with pressurized hydrogen or natural gas can be done with the mobile Tankfix MS 300 at nearly any place The tank system can be supplied by individual cylinders or gas cylinder bundles By its unique plug system Tankfix MS 300 is packaged in a compact transportation box with the dimensions of 1m 1 2m 1 1m W L H Tankfix MS 300 can be assembled within a few minutes Vehicles in test operations can world wide be supplied with hydrogen and natural gas by Tankfix MS 300 For stationary applications Tankfix MS 200 was developed as for fleet applications Tankfix MS 200 as well as Tankfix MS 300 need a footprint of approx 0 9m 1 2m 2 3m Optionally the filling station can be used to empty fuel tanks e g before transport or maintenance by integration of a service clutch If desired additional connections can be provided for flushing of fuel tanks with nitrogen Example Mobile filling station Tankfix MS 300 Mobile filling station for refueling of hydrogen or methane powered vehicles by compressed gas cylinder bundles Number of gas cylinder bundles 3 Maximum

    Original URL path: http://ms2-engineering.de/e_produkte_tankstelle.htm (2016-02-12)
    Open archived version from archive


  • 12 kW up to 100kW Gas supply Flow rate cathode 250 Nl min 600 Nl min 4500 Nl min Flow rate anode 100 Nl min 200 Nl min 1500 Nl min Humidification Direct steam proportioning Direct steam proportioning Direct steam proportioning Humidity dependent on pressure and flow from dry to 100 r H at 90 C from dry to 100 r H at 90 C from dry to 100 r H at 90 C Gas temperatures up to 130 C up to 130 C up to 130 C Back pressure control 1 05 5 bara 1 1 5 bara 1 1 5 bara Stack cooling Max temperature 130 C 130 C 130 C Max pressure cooling system 6 bara 6 bara 6 bara Max flow cooling system 25 l min 40 l min 250 l min load bank Max power current voltage 5 kW 600 A 100V 10 kW 800 A 160 V 100 kW 600 A 600 V Water cooled standard standard optional Regenerative optional optional standard cell voltage monitoring 20 channels 60 channels 360 channels Dimensions LxBxH m 1 5 x 1 2 x 2 2 1 6 x 1 4 x 2 2 2 5 x 1 8 x 2 2 Optionally the test benches for fuel cells can be extended with CAN BUS interface Measurement of anode and cathode humidification Online gas analytics for exhaust gas and recirculation H2 CO CO2 N2 CO2 concentration Impedance spectroscopy Anode gas admixsture up to 5 gases flow ranges Regenerative load bank Connection box for additional sensors arbitrary by the operator DMFC configuration up to 5 kw fuel cell power Binding of the test bench to your data base Interface for HIL simulation with MATLAB SIMULINK back Test benches for fuel cell systems A fuel cell itself supplies no electrical

    Original URL path: http://ms2-engineering.de/e_produkte_brennstoff.htm (2016-02-12)
    Open archived version from archive


  • about the potentials and risks of the differnet options before developing a requirement specification In our studies and concepts we considere the entire life cycle of the test benches e g operating costs maintenance and recycling The several concepts can be compared by trade off analysis The criterias and rankings of the analysis will be adapted to your needs Thus you can determine the right balance between costs and benefits

    Original URL path: http://ms2-engineering.de/e_engineering_technostudien.htm (2016-02-12)
    Open archived version from archive



  •