    Work completed Calculated heating requirement from previous consumption of the old boiler Heating requirement calculated for the new boiler by applying envelope technique Designed new heating system gross calorific value boiler distribution pumps expansion tank Design of hot water system Design of controlling system Special circumstances After information and data research by the contractor the job was completed by email Consumption data Before redesign 22 24 Liter m a After

    Original URL path: http://www.beitzke.de/en/ref/jasko.html (2016-02-08)
    Open archived version from archive


  • System Integration Beitzke | References | Energy consultancy
    pump running continously all year through 5000 pumping hours saveable per year Special circumstances In 1996 the dual boiler system 245 275kW was installed and adjusted by a general contractor which in the following years cost the heating contractor a lot of money The system kept the two boilers at a constantly high temperature This was because the minimal settings of the controller were incorrectly set at 69 C and

    Original URL path: http://www.beitzke.de/en/ref/asti.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    120 m No of residents variable Work completed Heating requirement calculated by applying envelope technique Designed heating system wood fired stove existing distribution pumps expansion tank radiators with preadjustable thermostatic valves Design of hot water system Design solar system General energy saving advice One of the many small farmhouses in Rassina Castel Focagnano district You can enjoy a holiday at the foot of the Pratomagno in the valley where the

    Original URL path: http://www.beitzke.de/en/ref/sdomenico.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    requirement calculated for the new boiler by applying envelope technique Ventilating amount of air and heat calculated Designed new heating system gross calorific value boiler distribution pumps expansion tank radiators with preadjustable thermostatic valves Design of hot water system Design of controlling system for heating and ventilation General energy saving advice Special circumstances Variation in number of residents made it necessary to only heat some parts of the building Consumption

    Original URL path: http://www.beitzke.de/en/ref/dargow.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    savings which I was unable to achieve alone Although I can now to some extent manage the system alone it is clear to me that without the leads you gave this would not be possible Object data Location Schillingstraße 20 44139 Dortmund Heated area 539 m Heated floors 5 Work completed The consumption of heating energy was cut Heating up time was cut by controller set up measurements Hydraulics balanced The expansion tank volume was recalculated and the tank swapped out Full use made of the control range of Vaillant controller The 2 stage boiler was adapted to the heating requirements of the building Bolier better protected against condensation etc Special circumstances Replacing the boiler in 2000 with a low temperature gas boiler was the result of incorrect advice to the owner by the plumber because it could have been possible to install a well modulating condensing value gas burner which would have paid for itself after 2 years by consuming less From year 3 the boiler would have saved money every year like a savings contract Plus interest However this advantage would have gone to the tenants only so its easy to imagine why the installer was not particularly

    Original URL path: http://www.beitzke.de/en/ref/vwdortm.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    4 Work completed Design under floor heating distribution Design solar system with open buffer Calcium carbonate protection measures General energy saving advice Special circumstances After information from the contractor the job was completed by email The water required special calcium

    Original URL path: http://www.beitzke.de/en/ref/roek.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    heating in the workshops with heat generation fine tuned to requirements General energy saving advice Special circumstances Since the workshops were used on an irregular basis installation of heat generation to requirements to improve system efficiency was completed in 1 2005 The 10 point improvement acheved by manual switch off of the boiler in summer enabled us to identify that the greatest potential saving was achievable by reducing stand by

    Original URL path: http://www.beitzke.de/en/ref/dog.html (2016-02-08)
    Open archived version from archive

  • System Integration Beitzke | References | Energy consultancy
    with distribution expansion tanks pool control Renewed the control of the main house General energy savings consultancy Special circumstances In this remedial project completed in summer 1998 we rebuilt 4 heating systems renewed the heating control system of the main buiding since the two boilers for the underfloor heating and swimming pool hot water would not function together All heating systems were converted for use of natural gas instead of